my foundation guys - Coello and Assoc.
the concrete trucks
the footings are poured and form-a-drain put in
the wall forms are ready and waiting
garage footings
facing west
footings in front of house
wall forms go up
wall forms up and braced around house/garage
concrete is poured into wall forms
concrete is pumped into wall forms from a large truck
walls are poured and braced
poured walls are braced and now must cure
poured walls will have brick pattern on the inside wall
walls braced inside and out
forms come off - garage area shown
foam insulation board is applied to walls
basement windows on west end - 2 ft. exposure for light in basement
haunches on front of house for porch support
close-up of poured-in-place basement window (36" x 16")